By Our Guwahati • February 14, 2026 • , , , ,

Prime Minister Narendra Modi is scheduled to visit Assam in March to lay the foundation stone for the Silchar–Shillong–Guwahati High-Speed Corridor, a major highway project estimated to cost over ₹22,000 crore. The proposed four-lane access-controlled greenfield corridor aims to significantly reduce travel time between Guwahati and Silchar to nearly five hours.

The visit will mark the Prime Minister’s third trip to Assam this year and will focus on launching what the state government describes as one of the largest highway infrastructure projects currently being undertaken in the region.

Prime Minister Narendra Modi will visit Assam in March to lay the foundation stone for the ₹22,000-crore Silchar–Shillong–Guwahati High-Speed Corridor. The 166.80-km greenfield highway aims to reduce travel time between Guwahati and Silchar to nearly five hours and improve connectivity between Barak Valley and the rest of the Northeast.

What The Corridor Means For Guwahati

For Guwahati, the corridor is expected to:

  • Strengthen its position as the primary gateway to the Barak Valley
  • Improve freight movement between Silchar and Guwahati markets
  • Reduce dependency on existing, longer highway routes

The project is likely to enhance inter-state trade, passenger mobility, and economic linkages between Assam and Meghalaya, with Guwahati serving as the central connectivity hub.

Project Details

  • Estimated Cost: Over ₹22,000 crore
  • Total Length: Approximately 166.80 km
  • Meghalaya Section: 144.80 km
  • Assam Section: 22 km
  • Configuration: Four-lane access-controlled greenfield highway

The corridor is designed to provide faster, safer, and more efficient travel between Silchar in Barak Valley and Shillong in Meghalaya, linking onward to Guwahati.

Once completed, the travel time between Guwahati and Silchar is expected to reduce to around five hours.

Modi’s Recent Visits To Assam

The Prime Minister has already visited Assam twice this year.

In January, he attended the “Bagurumba Dwhou 2026” cultural event in Guwahati, performed the Bhoomi Pujan for the ₹6,950-crore Kaziranga Elevated Corridor Project, and flagged off two Amrit Bharat Express trains.

In February, he inaugurated and inspected key infrastructure projects, including the Emergency Landing Facility at Moran and the Guwahati–North Guwahati Bridge.

The upcoming March visit will focus primarily on the new high-speed corridor.

State Government’s View

Assam Chief Minister Himanta Biswa Sarma described the project as a “game-changer” for the region while speaking on February 15. The state government has highlighted the corridor as the largest infrastructure project undertaken by the Union government in Assam so far.

What Happens Next

The foundation stone is expected to be laid during the Prime Minister’s March visit. Detailed timelines for construction and project completion are yet to be officially announced.

Frequently Asked Questions

How long will the Silchar–Shillong–Guwahati corridor be?

The total length of the corridor will be approximately 166.80 kilometres, with 22 km in Assam and 144.80 km in Meghalaya.

How much will the project cost?

The estimated cost of the project is over ₹22,000 crore.