The stench is noticeable even before the drain comes into view. On Ajanta Path in Guwahati, black, stagnant water barely moves through stormwater drains clogged with plastic packets, vegetable waste, carry bags and broken thermocol.
Residents say this is not an isolated case. From Noonmati to Basistha, Hatigaon to Zoo Road, drains meant to carry rainwater have increasingly become dumping channels, raising concerns ahead of the monsoon season.
Despite the Guwahati Municipal Corporation (GMC) launching new mechanised sanitation vehicles on January 28, residents report that stormwater drains across areas like Ajanta Path, Noonmati and Hatigaon remain clogged with waste. Many fear recurring waterlogging if cleaning does not improve before the monsoon.
GMC’s January 28 Sanitation Push
On January 28, the Guwahati Municipal Corporation launched a new fleet of mechanised sanitation vehicles near the APSC building.
The fleet included:
- 4 sweeping machines
- 50 auto tippers
- 7 suction machines
- 14 dump tanks
Housing and Urban Affairs Minister Jayanta Malla Baruah, Mayor Mrigen Sarania, Deputy Mayor Smita Roy and GMC Commissioner Chinmoy Prakash Phukoon were present at the flag-off event.
Officials said the initiative would reduce manual labour and speed up drain cleaning and garbage management across the city.
Promise of Faster Drain Cleaning
GMC stated that the new machinery would be deployed in phases, based on ward-level requirements.
The corporation also indicated that mechanised cleaning would be expanded gradually, particularly in areas prone to recurring waterlogging during heavy rainfall.
The announcement came as part of broader efforts to strengthen urban sanitation and drainage management in Guwahati.
Ground Reality in Several Areas
However, residents in multiple localities say visible improvements are yet to be seen.
In the Ajanta Path, drains remain clogged with mixed waste. Similar complaints have emerged from Noonmati, Basistha, Hatigaon and Zoo Road.
Residents report slow water flow, foul smell and accumulation of solid waste in stormwater channels.
With pre-monsoon showers approaching, concerns are rising about potential flooding in low-lying areas.
Waterlogging Fears Before Monsoon
Guwahati has historically faced severe waterlogging during monsoon months, particularly in areas with blocked drainage systems.
Stormwater drains play a critical role in preventing urban flooding. When clogged with garbage, the risk of overflow increases significantly.
Residents are urging timely and sustained cleaning efforts rather than one-time drives.
Why This Matters for Guwahati
Urban drainage and sanitation directly impact public health, traffic movement and daily life in the city.
As Guwahati continues to expand, effective waste management and drain maintenance remain central to preventing seasonal disruption.
The performance and deployment of the newly launched mechanised fleet will likely be closely monitored in the coming months.
What Happens Next?
GMC has stated that mechanised cleaning will be expanded in phases. Residents expect clearer timelines and visible on-ground implementation.
With monsoon season approaching, sustained drain desilting and waste removal will be critical to prevent waterlogging across the city.
Frequently Asked Questions
When did GMC launch the new sanitation fleet?
The Guwahati Municipal Corporation launched the mechanised sanitation vehicles on January 28 near the APSC building.
Which areas are reporting clogged drains?
Residents from Ajanta Path, Noonmati, Basistha, Hatigaon and Zoo Road have reported persistent drain blockages.